Good site preparation helps commercial locker installation run faster, reduces the risk of damage or delays and makes it easier to achieve straight, secure and professionally finished locker banks.
Before lockers arrive, confirm the final layout, delivery route, floor condition, wall construction, services and access for installers. Electronic locks, power, data, benches, plinths and surrounding trades should also be coordinated before installation begins.
For larger school, workplace, gym and commercial projects, these details should be resolved during planning rather than when the delivery vehicle reaches site.
1. Confirm the Final Locker Layout Before Delivery
Start with the approved locker layout.
The installation team should know:
• Exact locker locations
• Number of locker banks
• Number of units in each bank
• Locker widths, heights and depths
• Door configurations
• End-panel locations
• Plinth or stand requirements
• Sloping-top requirements
• Bench positions
• Locker numbering sequence
• Electrical requirements
• Final finished floor level
Check the drawing against the actual site.
Construction projects can change between the initial measure and installation. Walls may move, joinery may become deeper, skirtings may change or another service may occupy space originally allocated to lockers.
Measure again where there has been any significant construction change.
Mark Locker Locations
For larger installations, marking the proposed locker bank on the finished wall or floor can reveal problems before delivery.
Confirm:
• Start and finish points
• Clearance from corners
• Clearance from doors
• Clearance from switches and outlets
• Bench position
• Door-opening space
• Accessible circulation routes
Do not assume that a locker bank should simply fill every available millimetre of wall.
Small allowances may be required for:
• Uneven walls
• End panels
• Fillers
• Installation tolerance
• Future access to services
FDB Lockers can assist with site measurements, layouts and customised locker planning as part of its commercial locker installation services.
2. Check the Complete Delivery Route
Commercial lockers can be large, heavy and difficult to manoeuvre.
Measure the route from the delivery vehicle to the installation area.
Check:
• Loading dock access
• Kerb access
• Building entrances
• Door widths
• Door heights
• Corridors
• Corners
• Lift dimensions
• Lift load limits
• Staircases
• Landings
• Ceiling restrictions
• Temporary construction barriers
The locker itself may fit through a doorway but still be impossible to rotate through a narrow corridor immediately afterwards.
Check Assembled Dimensions
Find out whether the selected lockers arrive:
• Fully assembled
• Partially assembled
• Flat-packed
• In modular sections
This affects the minimum access dimensions.
A flat-packed laminate locker may reach a room that an equivalent assembled cabinet cannot.
Conversely, site assembly requires additional:
• Floor space
• Installation time
• Packaging management
• Access for tools
• Protection from other trades
Reserve Loading and Lift Access
Large projects can involve dozens or hundreds of cabinets.
Where the building uses shared:
• Loading docks
• Goods lifts
• Service corridors
• Security access
book suitable delivery windows before installation day.
Notify FDB Lockers early if the site has unusual access restrictions so delivery and installation can be planned around them.
3. Ensure Floors Are Finished, Level and Clean
Locker banks need a stable base.
Before installation, floors should generally be:
• Complete
• Dry
• Clean
• Structurally suitable
• Free from debris
• Free from major level variations
Uneven floors can result in:
• Misaligned doors
• Inconsistent gaps
• Locker banks appearing out of level
• Doors opening or closing incorrectly
• Excessive adjustment at levelling feet
• Poor alignment between adjoining cabinets
Check New Concrete and Screeds
Where lockers are being installed over recently completed flooring, confirm that:
• Concrete has cured appropriately
• Screeds are complete
• Waterproofing is finished
• Tiles are installed
• Vinyl or carpet installation is complete where required
• Floor coatings have cured
Do not place heavy locker banks over unfinished flooring simply because the project program is running behind.
Identify Floor Falls
Changerooms and wet facilities may intentionally include floor falls toward drains.
This needs to be considered when positioning lockers.
Large locker banks across a sloping floor may require:
• Adjustable feet
• Raised plinths
• Custom bases
• Alternative positioning
The installation team should know about substantial floor variation before arriving.

4. Check Walls and Fixing Conditions
Many commercial locker systems are secured to walls or adjoining units for stability.
Before installation, establish what the wall is made from.
Common wall types include:
• Concrete
• Masonry
• Timber stud
• Steel stud
• Plasterboard
• Structural panels
• Tiled masonry
• Existing joinery
The correct fixing method depends on:
• Locker construction
• Locker height
• Wall structure
• Fixing position
• Building requirements
Do Not Assume Plasterboard Alone Is Sufficient
Where lockers require structural fixing, suitable framing or reinforcement may be needed behind the finished wall.
This should be coordinated before plasterboard is installed wherever possible.
Retrofitting reinforcement after the wall is finished can increase:
• Labour
• Cost
• Damage
• Project delays
Provide wall-construction information to the installer during planning.
Complete Wall Finishes First
Painting, tiling and other wall finishes should normally be completed before lockers arrive.
This helps prevent:
• Paint overspray
• Adhesive contamination
• Damage from later trades
• Difficulty finishing behind locker banks
The lockers should be one of the later components installed within a completed room.
5. Coordinate Skirtings, Architraves and Wall Projections
Small wall projections can prevent locker banks from sitting correctly.
Inspect:
• Skirting boards
• Tile skirtings
• Architraves
• Wall trims
• Dado rails
• Cable ducts
• Surface-mounted pipes
• Conduits
• Wall protection
A 20mm projection behind a locker bank can create a noticeable gap at the wall.
Depending on the project, the solution may involve:
• Removing the skirting behind the lockers
• Introducing a filler
• Modifying the plinth
• Moving the locker bank forward
• Scribing an end panel
Resolve this before manufacture where customised lockers are involved.
This is particularly important for architectural laminate lockers where the finished installation may be designed to resemble integrated joinery.
6. Plan Power and Data Before Electronic Lockers Arrive
Electronic locks, charging lockers and managed access systems may require electrical or data infrastructure.
Requirements can include:
• General-purpose outlets
• USB power
• Dedicated circuits
• Power supplies
• Data connections
• Controllers
• Network equipment
• Cable pathways
• Access-control infrastructure
Do not leave electrical planning until the lockers have been installed.
Battery-Powered Electronic Locks
Battery-powered locks may not require mains power to every locker, but the project may still require:
• Programming equipment
• Administrator credentials
• Gateway hardware
• Management systems
Confirm requirements with the lock supplier.
Hardwired Locking Systems
Hardwired locking requires considerably more coordination.
Power and data may need to be routed:
• Behind locker banks
• Through locker carcasses
• Above lockers
• Through adjoining joinery
The electrician and locker installer should work from the same final design.
Device Charging Lockers
Powered device lockers may require:
• GPO outlets
• USB outlets
• Internal power boards
• Cable management
• Ventilation
• Suitable circuit capacity
Discuss electrical requirements before finalising the locker specification.
The FDB Lockers range of locker locks includes mechanical, battery-powered and advanced electronic locking options with different infrastructure requirements.
7. Finish Surrounding Trades Before Installation
Commercial locker installation is easier when the room is substantially complete.
Where practical, finish:
• Electrical rough-in
• Plumbing
• Painting
• Flooring
• Ceiling works
• Wall finishes
• Joinery
• Fire services
• Air-conditioning works
before the lockers are installed.
Why Trade Sequencing Matters
Once lockers are installed, access behind or above them may become limited.
Another trade subsequently working around completed lockers can:
• Scratch doors
• Damage finishes
• Cover lockers in dust
• Move aligned cabinets
• Damage electronic locks
• Leave paint or adhesive residue
If another trade must return after installation, protect the lockers appropriately.
8. Clear the Installation Area
The room should not become temporary project storage immediately before locker installation.
Remove:
• Building materials
• Packaging
• Furniture
• Equipment
• Tools
• Waste
• Unused pallets
Installers need room to:
• Unload units
• Rotate cabinets
• Assemble components
• Join locker banks
• Fit accessories
• Install panels
• Open doors
• Use tools safely
A narrow working area significantly slows installation and increases the risk of accidental damage.
Allow Space for Unpacking
Large locker deliveries generate packaging.
Plan an area for:
• Cardboard
• Protective foam
• Plastic wrapping
• Pallets
and establish how waste will be removed.
9. Confirm Bench, Plinth and Sloping-Top Requirements
Accessories affect the dimensions of the completed installation.
These can include:
• Locker stands
• Raised plinths
• Enclosed plinths
• Bench seats
• Sloping tops
• End panels
• Corner fillers
• Overhead infills
Locker Benches
Benches require additional circulation space.
Measure the distance between:
• Locker door and bench
• Bench and opposing wall
• Bench and opposing locker bank
• Bench and doorway
Users should have sufficient room to open lockers, sit and move through the changeroom.
Sloping Tops
Sloping tops can help:
• Discourage items being stored above lockers
• Reduce dust collection
• Create a cleaner finished appearance
Ceiling height and services above the locker bank need to accommodate them.
Plinths and Stands
Plinth selection can affect:
• Final locker height
• Cleaning access
• Moisture exposure
• Floor alignment
Wet or frequently cleaned areas need particularly careful base specification.
10. Protect Electronic Locks and Finished Surfaces
Locker doors and locking hardware should remain protected until handover.
Avoid using installed lockers as temporary:
• Workbenches
• Tool storage
• Construction shelves
• Protective barriers
Protect Laminate Lockers
Laminate doors and end panels can be damaged by:
• Tools
• Impact
• Paint
• Adhesive
• Excessive water
Protect Steel Lockers
Powder-coated steel lockers should be protected from:
• Abrasive building debris
• Metal tools
• Wet construction materials
• Scratches that penetrate the coating
Protect Plastic Lockers
Commercial plastic lockers are durable but can still be scratched, marked or contaminated during construction.
Installation completion does not mean the locker system should become available to every remaining contractor.
11. Inspect and Test the Finished Locker Installation
Before handover, inspect the complete system.
Check Locker Alignment
Confirm:
• Banks are level
• Doors align consistently
• Gaps are even
• End panels are secure
• Plinths sit correctly
• Sloping tops align
Test Doors
Open and close representative doors throughout the installation.
Check for:
• Binding
• Misalignment
• Incorrect hinge operation
• Doors contacting adjacent units
• Excessive movement
Test Locks
Every lock should operate correctly.
Depending on the system, test:
• Keys
• Combination codes
• RFID credentials
• Digital keypads
• Administrator access
• Master access
• Electronic status indicators
Check Accessories
Inspect:
• Shelves
• Hooks
• Rails
• Numbering
• Bench seats
• Electrical outlets
• Charging points
Any defect is easier to resolve before the installers leave site.
12. Plan Locker Numbering Before Handover
Locker numbering is easier when a clear sequence is established during design.
Consider whether numbering follows:
• Room sequence
• Row sequence
• Department
• Floor
• Year level
• Employee allocation
• Membership system
Avoid arbitrary numbering that becomes difficult to administer.
Electronic locker systems may also require numbering to match software or building-management records.
Document the final arrangement for whoever will administer the lockers.
13. Prepare for User Handover
A technically correct locker installation can still create problems if nobody knows how to operate it.
Provide administrators with:
• Master keys
• Spare keys
• Lock instructions
• Reset procedures
• Electronic administrator credentials
• Product documentation
• Maintenance information
• Final locker numbering
Users may also require guidance on:
• Lock operation
• Shared versus assigned use
• Reporting faults
• Items that should not be stored
• End-of-day locker policy
This is especially important for shared workplace and gym lockers.
14. Avoid Common Locker Installation Delays
Unfinished Floors
Installing before floors are ready creates alignment and protection problems.
Incorrect Wall Measurements
Changes after manufacture can require fillers, modifications or relocation.
Restricted Delivery Access
Large cabinets may not fit through lifts, corridors or doorways.
Missing Electrical Services
Powered or hardwired lockers cannot be commissioned without the required infrastructure.
Other Trades Still Working
Completed lockers can be damaged while the room remains under construction.
Unplanned Skirtings
Locker banks may sit away from the wall.
No Storage for Delivered Units
Lockers awaiting installation require a safe, dry holding area.
Layout Changes on Installation Day
Late changes can affect:
• Locker quantities
• Bench positions
• Fillers
• Electrical connections
• Numbering
• Door clearances
Finalise decisions before delivery wherever possible.
Locker Installation Site Checklist
Before installation day, confirm:
• Final locker drawings approved
• Locker locations marked
• Quantities and configurations confirmed
• Delivery route measured
• Loading access booked
• Lift access confirmed
• Floors complete and level
• Wall construction confirmed
• Wall finishes complete
• Skirtings coordinated
• Services complete
• Power and data ready
• Electronic lock requirements confirmed
• Other trades clear of the area
• Bench positions checked
• Plinths and stands confirmed
• Installation area empty
• Packaging-disposal plan prepared
• Locker numbering confirmed
• Site representative available
• Handover requirements understood

Conclusion
Successful locker installation starts before the lockers arrive.
Confirm the layout, delivery route, floor levels, wall construction, electrical infrastructure and surrounding trades early. Leave enough working space for installers, coordinate accessories and locking systems, and inspect the completed installation before handover.
For complex commercial projects, involving the locker supplier during planning can prevent expensive changes later. FDB Lockers provides site consultations, measurements, layout assistance, delivery and installation support for locker projects across Australia.
Organisations planning a new locker fitout can request a quote from FDB Lockers before finalising room layouts or construction requirements.